The Vara Pickup & Return
The 'Vara' or 'Garrocha' as it is called in some countries, is the long wooden pole used to remove the ring from the bull.
The pickup of the vara from a 'barrel' type receptacle and the return to either another barrel or the same one are key skill elements of the bull line. Getting the pickup wrong can effect you ability to get the ring and therefore is important to practice.
When practicing at home, it is not necessary to have either barrels or an official vara. As with all our training exercises you can recreate a safe alternative.
The first item to find is a barrel style receptacle. Alternatives options to an open topped barrel can be a feed bin (plastic or metal), a large trash can, a domestic wheelie bin, or even a tall cardboard box from a large delivery. Most important is to make sure there are no sharp edges should you ride too close and touch it, and that it is tall enough to take the length of your vara without falling over.
Your vara, or garrocha, can be made of wood, or plastic, or metal. An official vara is similar to a long broom handle. You can therefore use a long broom handle, a length of plastic pipe, or a bamboo garden cane. Hardware stores will be able to provide a piece of wooden dowel or a length of pipe. The diameter of your vara should be about 4cm or 1.5 inches. It should be able to be held in one hand easily. The length can be between 1.8m (6ft) and 2.4m (10ft). This isn't an official length and so if you can't find a suitable item at 1.8m long, something shorter will be fine. What is important is that it is long enough for you to reach from your horse when it is in your 'barrel'. You should be able to put your hand on it and pick it up without having to reach down too far.